Skip to content
For the complete documentation index, see llms.txt. This page is also available as Markdown.

Timeline

Seeing and adjusting your plan on a calendar

The Timeline shows the Planning tree on a calendar. Each project, study, and assay is a bar running from its projected start to its projected end. You can see at a glance how the work lines up, where it overlaps, and what's running late. You can also reschedule work by dragging the bars.

To open it, click Timeline at the top of the Planning page. The Timeline uses the same filters, sort order, and expanded rows as the tree. If you filter the tree and then switch to the Timeline, the filters stay in place. You can also link straight to it by adding ?view=timeline to the Planning page's address.

Reading the Timeline

The list on the left matches the tree: each row shows its code (or Private for a draft), its name, a lock icon if locked, and how many tasks it has. The row's … menu has the same options as on the tree view, including adding studies, assays, and tasks.

On the right:

  • Bars run from the projected start to the projected end. Their style shows the record's status: Active, In Planning, Draft, or Complete. A record with a start date but no end date has an open-ended bar.

  • A thin line inside the bar shows the record's actual dates, from the day it really started to the day it finished (or to today if it's still running). When work overruns its plan, the line extends past the end of the bar.

  • Task markers sit on each task's due date, styled as incomplete, complete, or overdue.

  • Today is marked with a vertical line.

The legend at the bottom of the page explains each style.

Zooming and scrolling

The Timeline opens on today's date. Choose Weeks or Months (the default) for a preset zoom, or use Zoom in and Zoom out. You can also hold Ctrl and scroll, or pinch on a trackpad. Click Today to jump back to the current date.

Rescheduling

Drag a bar to move both its dates by the same amount. Drag either end to change just the start or the end. Dates snap to whole days, and your change saves as soon as you let go.

While you drag:

  • A faint outline shows where the bar started.

  • Parents that will be extended to fit are highlighted, and the tooltip explains the effect, for example "Widens STUDY-3 by 4 days".

  • A parent's bar can't be shrunk past its children. The tooltip says "Held at its children's dates" when you reach that limit.

If the change can't be saved, the bar moves back to where it was and Lab Atlas tells you why.

You can't drag a locked record, or one you don't have permission to edit.

An assay being rescheduled and automatically adjusting the parent study schedule.

Scheduling a record with no dates

Records without projected dates show No dates yet on their row. To schedule one:

  • Click on the row's track to place a bar starting on that day, or

  • Drag across the track to set the start and end together, or

  • Click Schedule.

A bar placed with a single click starts with a default length: 90 days for a project, 30 for a study, and 14 for an assay. You can then drag it to the right length.

Using the keyboard

Press Tab to move to a bar, and Enter to open its details. To move it, press Space to pick it up, use the left and right arrows, and press Space again to drop it. Hold Shift while pressing an arrow to move only the end date, or Alt to move only the start date. Press Esc to cancel.

Opening a record

Click a bar or a row to open the same details panel as on the tree view, where you can edit the record, change its owner, or activate it. Click a task marker to open the task's panel.

Last updated